Autodesk InfraWorks 360 (i.e., automated 3D model building, cloud technology, and specialized features for road, bridge, and drainage design) helps civil engineers plan and design transportation infrastructure. It allows them to manage larger-scale infrastructure models created from existing data sources, engineer in context from the start and generate proposals at the appropriate level of detail.
Project Boulder for InfraWorks 360 was our technology preview that matched the simplicity of two-dimensional (2D) flood simulations together with the immersive 3D models of InfraWorks 360. As a collaborative effort between Autodesk and Hydronia, InfraWorks 360 users had the ability to simulate, visualize, and animate 2D flood events directly in the Autodesk InfraWorks 360 model environment while utilizing the Hydronia RiverFlow2D computation model.
The technology preview has ended. Project Boulder for InfraWorks 360 was available until June 30, 2016, at which time the…
Leave a Comment
You must be logged in to post a comment.