MT – Using BIM as a PM Tool: 4.3. – Secondary Data Summary

An exhaustive research was done to find the 35 case studies that served us as a basis to analyze the influence of BIM in real life construction projects.
The sample of projects was not homogeneous, with half of the case studies being projects build in United States (Table 4.4). This is probably due to the higher penetration rates of BIM in USA compared to Europe (Figure 1.2) and a higher number of scholars and professional bodies publishing articles about the subject on the west side of the Atlantic ocean. Regardless of this, 35 case studies are an important sample, and the results and finding obtained are relevant to analyze the role of BIM as a PM Tool.

Table 4.4 Case Study Count per Country
Country
Number of Case Study Projects
Percentage
USA
18
51,43%
UK
8
22,86%
France
2
5,71%
Canada
2
5,71%
Israel
2
5,71%
Germany
1
2,86%
China
1
2,86%
Middle East
1
2,86%
Total
35
100%

As it has been mentioned before, this part of the research was…