Advance Steel – Status Control Inside Model And Drawings

In Advance Steel, the users can use the options to provide a Status level to both the drawing and the model elements and it is often described as Key Stages/Life Cycles inside the production process.

 

The Status system remains as part of the Fabrication data inside Advance Steel, it can contain levels/statuses which are included to it through the Management Tool (MT) System. Besides, comment levels are included to approve the status.

 

Various colors can be arranged while generating anything inside the MT. These can then be applied to provide colourisation/highlighting to the model. It is accomplished with the project explorer and the saved Query Feature.

Together with this, there exist a status level for drawings, the drawing system is segregated to the model elements, because drawings may not always remain at the equivalent status as the model, as for instance the model may be left for revision, the elements in the model are updated, but the drawings are not located at similar…

Read more