Building information modeling (BIM) process gains huge popularity among the architecture and construction industry. Since, BIM is extensively used by several architectural and engineering firms into their practice, it becomes difficult for the project managers to control the project teams employing BIM.
Given below, some vital tips to manage project with BIM in an efficient manner.
Recognize the method
BIM stands for a collaborative method of generating coordinated, internally logical and quantifiable information concerning a building with a central system of 3d models in spite of a separate set of 2d drawings. It is a new way of working that simplifies the workflow with an unified approach.
Know the competencies of the tool
A Revit model is much more than a 3d model, it contains a database of information which can be used for constructability analysis, quantity take-offs, performance analysis, facilities management and so on. Working in a model based framework makes sure greater…