NBS Chorus continues to be used more and more now on construction projects around the world. It’s been really good this year to hear how it is being used and learn from the experience of the architects and engineers who have been the early-adopters.
We now have a nice case studies page on our website:
– theNBS.com/Case-Studies
In this blog post, I just wanted to highlight two of these below.
1. BDP – Large Multi-disciplinary practice
The BDP case study tells the story of mutli-disciplinary specification across the project team on a new build primary school project in Scotland.
Primary school |
The case study is taken from the AU London class from myself and BDP’s Alistair Kell. It looks at how specification and model can be developed in parallel from the Developed Design stage of a project through to Technical Design.
If you are interested in learning more about producing a fully coordinated set of design and specification information all classified to Uniclass 2015 then check out the story…
Read more