This new right-click choice exists, within the Project Browser, for views that are on sheets. Views that are real that is. Schedules are special views, they can be placed on more than one sheet (like Legends). Electrical Panel Schedules share this distinction but unlike other schedules they are not nearly as likely to require being placed on more than one sheet. Their schedule-ness makes this right click option invalid for them too.
I realize it probably isn’t easy or perhaps even possible to segregate this schedule-ness from Panel Schedules but I would have found it very handy to be able to use the Open Sheet concept for them several times today. In this instance it would have been faster than navigating through a very long list of sheets. I suppose it is also possible that some firms do need to be able to put Panel Schedules on more than one sheet, in which case…bummer for me and…
Read more
Leave a Comment
You must be logged in to post a comment.