MT – Using BIM as a PM Tool: 4.1 Results from Case Studies

Several case studies were collected from existing literature to analyze in which areas the application of BIM had improved aspects of the projects studied.
The literature on each case study was carefully read and analyzed and those aspects regarding the benefits and problems or challenges of implementing BIM where collected.
The total number of case studies gathered was 35. The total number was not previously defined, but as relevant case studies were found, they were added to the research until the timeframe of this dissertation didn’t allow more of them to be found and analyzed. The author of this research is confident that the number of case studies used is big enough to extract conclusions.
After each positive and negative aspect of the implementation of BIM had been collected for each case study, these were translated into the key performance KPI described on Table 3.1 and based on the PMBOK Knowledge Areas. It is relevant to mention here that this translation was not always…